← Rush Mind Apps Workflow

rushes ltd. · Mac app

Organise. Plan. Deliver. All in one place.

Workflow is the production studio on your Mac: outlines, projects, schedules, stories, and the paperwork that lands on a freelancer’s desk. Workspaces stay self-contained. Updates replace the app only — your data folder stays put.

Workflow — project management made simple

Latest version

Workflow 3.0.1

Universal Mac build (Apple silicon + Intel) · macOS 11 or newer · 27 October 2026

What’s new. Schedule import now reads row-by-row At-a-Glance week grids (DAY / DATE / SHOOT DAY / SET / LOCATION rows with a column per weekday) — from the import panel or by dropping the PDF onto a project. Shoot days and blocks, hours, night shoots, sets, locations, unit base, SAs and notes all land on the right day, with rest, travel, prep and Christmas break days marked. Your projects and data folders are kept.

Download 3.0.1 for Mac Freeware · Pricing coming soon

downloaded so far 52

This is the current signed Mac build — the same file Workflow → Check for Updates… uses. Older releases are not listed here.

Workflow project overview — stats, progress, Gantt, and project health on a dark Mac desktop
Project Overview — totals, progress, Gantt, and health. Tag bullets #todo / #doing / #done and the charts fill in.

A short tour of the studio

The in-app tour (Help → Tour) walks this path. Here’s the same map, in plain language.

1. Sidebar

Workspaces, Quick links, Inbox, Projects, Scratch, Writing, Stories, Talent, Freelance tools. Create, rename, reorder, pin, or archive. Each workspace is its own box.

2. Tabs & tools

Open spaces as tabs. Undo / redo, Quick capture, import, export, Clarity, and ⌘K from the top bar — without leaving the page.

3. Main canvas

The active view: outline, list, board, calendar, Gantt, spider, flow, schedule, repository, Story Studio. Switch from View or the in-space toolbar.

4. Just now

Edits land in a Recent changes strip. Each chip names what changed. Undo reverses the latest one.

5. Story Studio

Beats, draft, Script Reader (cast, scenes, elements), TV / Film bibles. Import Final Draft, PDF, or Fountain — the script breaks into scenes you can rename, move, or delete.

6. Projects & schedule

Shooting boards, day strips, PDF import with a preview. Repository keeps copied call sheets, sides, RAs, logs, and frame leaders — labelled, dated, searchable.

7. Edit logs & Metadata

EDITOR LOG takes, camera roll, lens sidecars, ALE and MHL. Select rings, filters, native Save for ALE / CSV.

8. Help anytime

Help → Tour restarts this walkthrough. Help → Workflow Help, Keyboard Shortcuts, and Preferences sit one click away.

See it

Inbox outline with view switcher for Outline, List, Board, Calendar, Gantt, Spider, and Flow
Inbox & outline. Nest with Tab. Todos, dates, archive, zoom. Views: Outline, List, Board, Calendar, Gantt, Spider, Flow.
Scratch pad canvas with pen, colours, stroke widths, and export PNG
Scratch pad. Draw, type, drop photos from Finder. Export PNG when the scribble becomes the brief.
Clarity panel showing Full, Focus, and Neuro workspace modes plus font and density
Full · Focus · Neuro. Full is the studio. Focus is the current view only. Neuro is one next thing — you choose look, layout, and how much chrome to show.
Clarity colour pickers and dyslexia helpers including reading ruler and lookalike words
Make it yours. Page, panels, sidebar, text, accent — every colour. Reading ruler, zoom on focus, writing lane, lookalike-word flags. Lexend, Andika, OpenDyslexic, or your own saved theme.
macOS Workflow menu with Check for Updates, Settings, and Clarity
On the Mac menu. About, Check for Updates…, Settings (⌘,), Clarity (⇧⌘,). Updates download first, then ask before install.

What you can actually do

Capture, then organise

Quick capture, Inbox, Ideas. Split a paste into bullets. Archive instead of delete. Command-K jumps anywhere.

Production projects

Overview, schedule PDFs, title page, board columns you rename. Import a script. Export when someone else needs the pack.

Repository

Drop the day’s PDFs and logs. Originals are copied as-is, labelled for that project, with a date or a date span you can edit.

Story & bibles

+ Story, + TV Bible, + Film Bible. Revision colours (White → Yellow…). Join a story to a project so cast hits the schedule.

DIT / post tools

ALE editor, MHL checksums, edit logs, lens metadata matcher (UMC-4 / DCS LDT → ALE). Frame Leader for digital and film charts. Website Builder for visual + code editing, URL import, and FTP/SFTP deploy.

Freelance

Overtime stopwatch with weekday / Sat / Sun rates and UK tax estimates, tied to your Workflow projects and talent pool.

Install on a Mac

  1. Workflow is not an App Store app. Control-click → Open → Open again, or System Settings → Privacy & Security → Open Anyway.
  2. It must live in Applications. Accept Terms, then open Help → Tour.

Your projects live in a separate data folder. Reinstalling or updating the app does not wipe them. Activation is not required in this build — Preferences → License is there for later.

Get it on your Mac